Having the right tools to install motorized screens turns a frustrating day into a smooth one. Fasteners and tools are not included with the screens, so gather everything below before delivery day.
The tool list
Must have
- Self-leveling laser level; in daylight, one with a detector or receiver
- 6 ft bubble level, for plumbing the side tracks
- 25 ft tape measure
- Hammer drill (standard, hammer or SDS) with masonry and metal bits
- Impact driver with bits for your fasteners
- Chop saw with an aluminum-cutting blade, for trimming tracks
- Fine sandpaper or emery cloth, for deburring cuts
- Ladders and a helper
Good to have
- Non-marring rubber mallet
- Stud finder, for wood framing
- Bar clamp and a wood block
- Chamfer bit
- Caulk gun and caulk in a matching color
- Clean rags and a solvent such as mineral spirits for wiping metal
- Anti-seize compound for stainless screws
- Extension cord and eye protection
Choosing fasteners
Pick fasteners rated for your wall and long enough to bite well into it, and plan enough of them for the weight of the hood and the pull of the screen in wind: at least every 24 inches along the side tracks. Stainless or coated fasteners hold up best near salt air. Hurricane screens use the anchors listed in their approval drawings; see installing hurricane screens.
Prep checklist
- Power. Decide where the cord will enter the hood (left or right) and have an outlet or a junction box ready, done to your local electrical code.
- Surfaces. Look at the columns and beam. Uneven stucco may need shims or a build-out so tracks and hood are not bent to the wall.
- Delivery. Freight arrives on a truck; have help to unload long boxes. Inspect each box before you sign, and note any damage on the delivery receipt.
- Parts check. Open everything and match it to the packing list before drilling.
- Read and watch. Read the One-Track guide and watch the videos once through.